ABC Tissue Products Pty Ltd

Location: Wetherill Park NSW

Date Completed: 14.10.2017

Steel Used (Tons): 800

800 TON OF STRUCTURAL STEEL

For this project, we used 25 metre high columns weighing close to 8 ton each. 

Structural Steel columns

THE FINISHED RESULT

DAM Structural Steel was able to organise and execute this project without a hitch. Click through the slider gallery to see how this project came together.

Browse Other Case Studies

Structural Steel for ABC Tissue
Steel Frame at Campbelltown Stadium

Structural Steel for ABC Tissue

25 metre high columns weighing 8 ton each

We were pleased to complete this steel project for ABC Tissue, as part of their manufacturing expansion.

Continue reading

Steel Frame at Campbelltown Stadium

Working with Campbelltown Council

This was a small job for DAM Structural Steel, nonetheless – we give every project the same level of attention to detail.

Continue reading

Reasons to Choose DAM

One Central Contact

Deal directly with your Site Manager for the entirety of your project.

Customer Satisfaction

We are a family owned and operated company that values your feedback.

Complete Service

We handle the job from start to end with our own workers and equipment on-site.